One: To enter the work area to wear good work clothes, gloves, not to wear slippers, high heels to enter.
2. Check before operation
1. The site should be cleaned before the equipment operation, the platform and surrounding areas should not be stacked with debris, and the oil and gas pipes should be sorted out to prevent the pipeline from being squeezed during operation;
2. Check whether the connectors of the oil and gas pipes are well connected and whether the pipelines are damaged. If damaged, replace them in time.
3. Check whether the fixing bolt of the tower column rolling pulley is loose and must be tightened in time to avoid damage to personnel and items caused by the tower column slipping;
3. Operation procedures for loading and unloading vehicles
1, the platform lifting equipment accessories are strictly prohibited to stand, the vehicle must be guided by someone next to the vehicle, the vehicle should stop at the designated position of the platform;
2, the platform lifting should be stable operation, platform wheel leg cylinder without throttle valve, strictly prohibited to open the oil pump drain valve;
3, when taking off and landing platform, the tower column is fixed at the other end of the platform to prevent sliding; The second lift is placed near the moving leg side;
4, the vehicle should tighten the parking brake on the platform, and the tires should be padded with triangular wood before and after;
5. The platform movable leg lock pin must be locked after the platform is raised;
Iv. Vehicle fixed operation rules
1. Check the clamp mouth before clamping, there should be no oil and debris
2. Check whether there are deformation and cracks in each part of the fixture. If there are any, it must be replaced to prevent breaking and flying out after being stressed.
3, the main fixture fixing bolts, clamp fastening bolts to be completely tightened
5. Measurement operation procedures
1, the measuring tool should be handled lightly, do not collide, to prevent the measuring tool deformation, damage;
2, when measuring the reading, the eye is parallel to the reading part to reduce the reading error;
3, the measurement is completed, the measuring tool should be immediately put back to the tool car;
4. After the measuring tool is fixed and the connecting screw is loose, tighten it again without too much force;
Six, stretching operation rules
1, before stretching operation, check whether the chain, sheet metal tools, pull ring is complete, no damage, cracks, big scratches can be used;
2, the tower bolt should be tightened when stretched, and the height of the guide ring should not exceed the warning red line;
3, check the chain, locking mechanism, the chain can not be twisted, all the chain in a straight line; Guide ring handwheel unscrew;
4, pay attention to the tensile force should not exceed the rated load of the tool;
5, do not knock sheet metal tools and chains when stretching;
6. When stretching, the relevant personnel should not be in the same straight line with the force direction of the chain;
7, when the tensile force is relatively large, the vehicle should be fixed on the platform with a chain on the opposite side of the pulling force;
7. After the equipment is used, clean up the site, sheet metal tools, measuring tools, fixtures and other items, and put them neatly and orderly on the tool car after wiping them clean.
China Guangdong Zhicheng Auto maintenance Equipment Technology Co., Ltd. is a set of auto cleaning equipment, auto maintenance equipment, auto maintenance equipment, testing equipment series product development, production, sales, after-sales service as one of the high-tech enterprises, welcome customers to call or leave a message consultation!
No.1 Zhenxing North Road, Tanzhou Town, Zhongshan City, Guangdong Province, China
+0086-181-2811-6842
551660872@qq.com
+0086-0760-86637050
+0086-0760-86637060
Copyright © 2023 China Zhuhai Zhicheng automobile maintenance equipment technology Co., LTD
Comment
(0)